The welding work on the steel tube piping network was performed by our certified technical staff. After its completion, the welding seams were checked by a portable ultrasound device, through which the position and the depth of the possible imperfections can be traced. During the delivery of the project, certificates of testing and regulation of both Hydraulic and Electrical Installations were submitted.