Supply and Installation of a High Efficiency Cooling System with a cooling capacity of 140 RT.
The Chiller System was placed in the Central Chiller Station of the Hospital in parallel with four other refrigerating units. The project also includes Base Construction, Hydraulic and Electrical Connections.
Before the Chiller System was installed, the water supply to the Chiller Station was measured with a special measuring instrument of AGtech, in order to proceed to the appropriate hydraulic adjustments.