Electromechanical Equipment and Installation in the Hellenic Gaming Commission Building

Maintenance of the Electrical and Mechanical Installations in the Hellenic Gaming Commission Building. Air Conditioning (VRV Systems, Heat Pump System and Central Air Conditioning Unit, Close Control Units for Building Computing Center), Fire Detection System, Fire Extinguishing Systems and Fire Brigade, CCTV, Low Voltage – Medium Voltage Substation, Generator, Water Supply System – Sewerage Systems, Pumping Systems and Lifts. It’s provided 24-hour technical coverage.

Air Conditioning Installation in Negative Pressure Chambers – «Sotiria» Athens Hospital

Air Conditioning and Vacuuming Systems for Infectious Diseases.Suction Control with Automatic Control Units, Inverters and Absolute Filters.The installation is fully autonomous with Heat Pump, Central Air Conditioning Units, Power Board and a Ventilation Unit with a safe replacement of absolute filters.A special arrangement allows the system to operate efficiently in the interim periods, where the operating mode is switched from cooling to heating on a daily basis.