Refurbishment – Supreme Court Building (Areios Pagos)

Medium Voltage Field Replacement, Oil Dehumidification and two 500 KVA generators Maintenance, Low Voltage Field Replacement, Displacement and Connector HZ 270 KVA. Prior to connecting the medium voltage cables, a dielectric strength test was performed. 30 KVAR Protection and Permanent Compensation Plans were placed in the area. In the new Low Voltage Fields a 300 KVAR Automatic Compensation Cabinet was installed. The work was completed in two phases. In the first phase, work was carried out on the Medium Voltage Fields. In the second phase, work was completed to replace GLPFs. In each phase, the power didn’t last longer than 48 hours.

Air Conditioning Engine Room – Ministry of Finance

The welding work on the steel tube piping network was performed by our certified technical staff. After its completion, the welding seams were checked by a portable ultrasound device, through which the position and the depth of the possible imperfections can be traced. During the delivery of the project, certificates of testing and regulation of both Hydraulic and Electrical Installations were submitted.

Annual Maintenance, Supervision and Operation of Electromechanical and Building Facilities in the Supreme Court Building (Areios Pagos)

Operation and Maintenance of all Electrical and Mechanical Installations at the Supreme Court Building and the Prosecutor’s Office. Air Conditioning (Hydro-Cooling Chillers, Closed Circuit Cooling Towers, Primary and Distribution Centrifugal Pumps, Central Air Conditioning Units, Natural Gas Boilers), Natural Gas Network, Fire Extinguishing System, Mid-Low Voltage Substation with Moisture Oil, X-Ray Handbag Control System, Central UPS System, Call Center, Speaker Installation, Water Supply Network – Sewerage Network, Pump Systems.

Annual Maintenance, Supervision and Operation of Electromechanical and Building Facilities in the Athens District Court

Operation and Maintenance of all Electrical, Mechanical and Building Facilities in the Athens District Court. Air Conditioning (52 VRV Systems with 245 Terminal Units and 125 VAM Ventilation Units), 2 Fire Detection Systems and Extinguishing Control Systems, Mid-Low Voltage Substation with 2 Dry and HZ Modules, Central Security Lighting System, Central UPS, Call Center, CCTV , Loudspeaker System, Water Supply Networks – Sewerage Networks, Pumping Stations

Electromechanical Installations at Drosia Nursery Station

Bioclimatic Design with a combination of Passive Energy Saving Systems (sunshades, window frames, glazing, insulations), Orientation, Exploitation of Solar Radiation for Hot Water Production and Heat Pump System for Energy Saving.